The forms came off, the exterior has been water proofed. The plumbers came and roughed in the basement plumbing. Also, the drain pipe has been installed around the exterior of the basement as well as a radon remediation system under the slab on the interior of the basement. As of today all of the poured footers are completed, we still have block footers to lay.
View from back corner of master bathroom.
This view is looking down the interior garage wall
A closer look at the footer for the screened in porch
Drainage tile
Zac for scale
No comments:
Post a Comment