Thursday, December 18, 2014

Trim work and tile




Master Bathroom shower, grouted but not yet calked


My own sink!


Her own sink!

Laundry room



Master Bedroom


Kid's playroom (the cabinets and counter will install on the wall to the right)
Kitchen Tile



I installed the speakers, this had to be done prior to insulating the ceiling the speakers are designed to be in direct contact with the insulation.


Septic system, sidewalk, and electricity





Our septic system is quite large and complex



A look down the sidewalk

A picture of WRECC installing the power to the house, we got a 400amp service and the meter is on the walk out wall, in order to do this we had to install conduit under the retaining wall which required some forethought (Thanks Larry!)

This is our single unit which is a 5 ton Trane dual fuel heat pump, we had to get heat in the house so that it would be warm enough for the tile to set.